Development history of waterproof and breathable membrane

2024-07-01

快去粘贴给你的好友吧!

In the 1950s, German architects found that the self-adhesive and airtight characteristics of asphalt waterproofing membrane and coating waterproofing materials led to the residual water in the concrete structure being enclosed in the structure, and the water vapor in the concrete structure could not be released, which led to the breeding of mold on the roof and wall, and the indoor air quality and human health were seriously threatened. Therefore, the German construction industry began to use the roof cushion with air permeability to replace the self-adhesive coiled material and film waterproof. This air permeability cushion is laid on the roof base layer, so that the water vapor of the cast-in-situ concrete roof panel can be quickly discharged, thus avoiding the breeding of mold.

相关新闻Related News

查看全部View More
Introduction to barrier film
How to use the breathing paper?
How is the waterproof vapor barrier film waterproof?
YARA MATERIAL SOLUTIONS

Contact Information

Yara

Yara

Yara


     

Business License